| |
Lib # |
Duration |
|
|
| |
12-1 |
16 min |
Base and Sub-Base Repair
Outlines 9-step base repair system: Placing traffic control devices, marking the limits for repair, cutting the pavement, removing all unsuitable material, installing sub-drainage, restoring subgrade and base, replacing pavement surface, cleaning work site, and removing traffic control devices. Also covered are on-site moisture tests. |
|
| |
12-2 |
10 min |
Chip Seal Coat Inspections
Video includes equipment and materials used in chip seal coats, and also the steps involved in chip seal coats. |
|
| |
12-3 |
40 min |
Chip Seal Application (Parts 1-3)
This three part video looks at preliminary concerns, materials, equipment, application rates, chip seal procedures and chip seal problems. |
|
| |
12-4 |
26 min |
Guidelines for Spring Highway Use
Explains how restricting truck loads in spring (spring thawing allows water to get in pavement and cause cracking) is the best way to prevent pavement cracking. Also gives guidelines for determining these restriction. |
|
| |
12-5 |
5 min |
Innovative Pavement Maintenance Technology (SHRP)
This video reports on spray injection pavement patching. |
|
| |
12-6 |
30 min |
LVR Handbook (Low Volume Roads)
Explains the practices and elements of low volume roads from Kansas DOT. |
|
| |
12-7 |
12 min |
Pothole Repair
Equipment, materials, and procedures used in pothole repair are shown. |
|
| |
12-8 |
14 min |
Pothole Repair in Surface Treatment Pavement
Videocassette clearly outlines an 8-step procedure for surface treated road repairs including the placing of traffic control devices, marking damaged areas, cutting out and removing damaged material, filling holes with granular material, compacting fill material, sealing surfaces with liquid asphalt and cover aggregate, cleaning the worksite, and removing traffic control devices. |
|
|
 |
© Nebraska Local Technical Assistance Program (LTAP), 3921 West Craw Street, Lincoln, NE 68524, (402) 472-5748 |
 |